CASE STUDIES

It’s not enough to simply say that Steiner increases part profitability by: reducing part process time by 80%+, eliminating costly secondary operations and automating your processes. Take a look at these real stories of customer outcomes:

Heavy Equipment

Annualized production time savings of 499 hours

Midwest Case Study

Total cycle time reduction equaled 89%

Hydraulic Cylinder

Cycle time savings of 45 to 60 minutes per part

Planetary Gear

Costly secondary broaching operation eliminated

Locomotive

Massive reduction in cycle time

Oil Manufacturing

Cut machining time by 95%