CASE STUDIES

It’s not enough to simply say that Steiner increases part profitability by: reducing part process time by 80%+, eliminating costly secondary operations and automating your processes. Take a look at these real stories of customer outcomes:

Heavy Equipment

Annualized production time savings of 499 hours

Midwest Case Study

Total cycle time reduction equaled 89%

Hydraulic Cylinder

Cycle time savings of 45 to 60 minutes per part

Planetary Gear

Costly secondary broaching operation eliminated

Locomotive

Massive reduction in cycle time

Oil Manufacturing

From 6 Hours Per Seat Pocket to Under 5 Minutes